EXP Rocket Page
Favlinks
Fav YouTubelinks
Fav Forumlinks
EXP Rocket Log Motor/Delay Date Alt.(Est.) Comments
Exclamatory E31-3 Jan.13/08 100 ft. 24mm Aluminum Casing - Ejection charge left out the back end of the rocket causing the rocket to coast.
My How-to Docs & Diagrams
Make Paper Casings
Making Paper Casing Nozzles
Making Inhibitors
DESPINA E41D-5-1 Apr.20/09 300'(est.)33.63mm PVC casing 2 grain- First Chute deployed by an SRP motor. The delay was a 1 second delay
CRESSIDA E41D-5-1 Apr.20/09 300'(est.)33.63mm PVC casing 2 grain- The nose cone popped out but the chute remained inside the main tube and did not deploy.
TELESTO E41D-5-1 Apr.20/09 300'(est.)33.63mm PVC casing 2 grain- This rocket deployed the chute, but a tether problem caused the chute not to open.
Making Ignitors
DESPINA F57E-9-3 May 31/09 700'(est.)33.63mm PVC casing 2 grain with delay. The delay ended up being a little after apogee. It was about 3 sec. delay.
TELESTO G100F-10 May 31/09 150'(est.)33.63mm PVC casing 3 grain with delay. Early BP ejection caused the rocket to stop in mid air.
CRESSIDA G74F-6 June/09 1000'(est.)33.63mm PVC casing 3 grain-
MIRANDA F57E-5 June/09 600'(est.)33.63mm PVC casing 2 grain-
HYDRA F57E-5 July/09 600'(est.)33.63mm PVC casing 2 grain-
STEPHANO E32D-5 June/09 400'(est.)33.63mm PVC casing 1 grain-
RED RHINO F47E-4 July/09 600'(est.)26.67mm PVC casing 2 grain-